Metro station maps are now available!

Colour Stripe
Mobile Colour Stripe

Other Access

The information on this page (the dataset metadata) is also available in these formats.

JSON RDF

via the DKAN API

Peak Trains Load Survey - March 2016

This dataset provides estimates of train loads during the AM and PM peak periods - derived from a survey held on Tuesdays, Wednesdays and Thursdays from 1 March 2016 to 17 March 2016.

The primary purpose of the train load surveys is to support service planning and rail timetabling. Surveys are conducted in March and September. March loads are the preferred dataset for network planning as it reflects the busiest time of year for train travel and is less subject to seasonal factors. The March loads are usually higher and provide a better gauge of rail system performance.

FieldValue
Modified
2017-08-01
Release Date
2017-01-19
Identifier
c691ab9d-63e9-41de-8330-dcdd5cf59cc8
Spatial / Geographical Coverage Location
Sydney Trains network and NSW TrainLink Intercity network (formerly CityRail)
Temporal Coverage
2016-02-29 to 2016-03-16
Licence
Author
Transport Performance and Analytics (TPA), formerly known as Bureau of Transport Statistics
Contact Email
Public Access Level
Public
Back to top